Civil engineering — As-built   Verification
Civil engineering

As-built Verification

Verification that everything is where it belongs

Overview

What is an as-built survey?

We measure the actual position of structures, foundations and installations and compare them with the design model. Deviations become immediately visible in a clear report with coordinates, deviation values and an assessment against the agreed tolerances.

As-built Verification
CoordinatesAs-builtNDM

Equipment & software

  • Leica TS16
  • Leica TS13
  • Survey analysis software

Why verification surveys prevent costly rework

During a construction project, structures shift, ground settles and deviations occur. Without verification surveys you only notice this when the next phase no longer fits. Regular verification prevents costly adjustments and disputes between parties.

When as-built surveying fits into your build phases

Verification surveys are valuable at every transition between construction phases: after pouring concrete, after placing steel structures, after equipment assembly. This way you stay in control of the dimensional accuracy throughout the entire project.

As-built measurements of an existing situation

If a construction phase is already finished, we still measure the actual situation. You receive the same coordinates and deviation values as with a survey during construction, except that the structure is already standing. It is still easier and cheaper to measure before the next phase covers the previous one, so plan the survey as soon as a phase is finished.

Our approach

How an as-built survey works on site

From intake to delivery. Every step aligned with your schedule.

1

Design received

We receive your design drawing or 3D model with the nominal positions and tolerances. This is the reference against which we measure.

2

Field survey

On site we measure the actual position of the structure or installation with a total station. Every measurement is checked for accuracy.

3

Comparison

The measured positions are compared with the design. Deviations in X, Y and Z are calculated and tested against the tolerances.

4

Deviation report

You receive a report with all measured points, the deviation per point and a clear conclusion: within or outside tolerance. Including advice on any exceedances.

What we deliver

What you receive after an as-built survey

As-built measurements versus design

Deviation reports with tolerances

3D coordinate measurements

Verification of steel structures and concrete work

SectorsSteel structuresConcrete constructionEquipment assemblyInfrastructure

A quote for As-built Verification on your project. Three short questions, usually a response within 24 hours.

Go to the form
Frequently asked questions

Frequently asked questions about as-built surveys

The most asked questions about As-built Verification. Question not listed? Feel free to get in touch.

That varies per type of structure. For steel structures, 3 to 5mm is common. For concrete work, 10 to 15mm. For equipment assembly it depends on manufacturer specifications. We test against the tolerances set out in your specification or contract.

A verification survey is recommended at every transition between construction phases. After pouring concrete, after placing steel, after assembly. The frequency depends on the risk profile and contract requirements.

Yes. As-built measurements of existing situations are always possible. It is, however, easier and cheaper to measure before the next construction phase covers up the previous one.

By default as a PDF report with overview drawing, coordinate list and deviation table. On request also as DWG or in your own report format.

In practice both terms are used interchangeably. In either case we measure the actual position of what has been built. With a verification survey we also compare that measurement with your design and check the deviation against the tolerances.

“We are very satisfied with the dimensional control service across various projects. From the very first contact, communication has run smoothly.”

Pelle van Oost, WeComplete

“Michael had everything worked out the day before and was able to come the very next day. Delivers good work and is professional. We are very satisfied.”

Marian Kwakernaak, Particulier

“The dimensional control service was excellent. The team delivered accurate and timely results, which kept the project running smoothly.”

Melvin van Drie, Opdrachtgever
Request directly

Request a quote for As-built Verification

Answer three short questions and leave your details. You usually get a response within 24 hours, on business days.

Step 2 of 3

Step 2 of 3: About your project

Request for:As-built Verification

About your project

A town or city is enough.

Do you have a drawing or 3D model of the situation? *
When does the survey need to take place? *
MvD
Michael van Drie
Owner Dutch Survey BV

No-obligation advice on the approach for your project. Usually a response within 24 hours.