Recording position and elevation on high-risk projects

Overview

What is settlement monitoring on a construction site?

For construction projects involving preloading, sheet piling or dewatering, the positions and elevations of surrounding buildings must be recorded with precision. In an NDM survey we determine the X, Y and Z coordinates of all relevant objects relative to NAP (Normaal Amsterdams Peil, the Dutch national height reference). This provides a reliable reference to detect any later movement.

NDM Surveys
NDMElevation differenceBaseline measurement

Equipment & software

  • Precision leveling instrument
  • Measurement bolts
  • Leica DNA03

The baseline survey as the reference for every later round

The process starts with a baseline measurement: the exact position and elevation of all relevant buildings and structures in the project area is recorded. This baseline is the reference. During periodic re-measurements we compare new values with the baseline to determine whether any height differences have occurred.

Ground settlement risk from sheet piling and dewatering

Not every project carries a risk of settlement. The risk rises with preloading, with installing or extracting sheet piles and with dewatering, because the groundwater level changes. Heavy earthworks directly next to existing buildings count as well. On those projects we measure the elevation of the surrounding buildings before, during and after the work, so that settlement becomes visible before it turns into damage.

How does this differ from a pre-construction condition survey?

A pre-construction condition survey records the visible condition of a building. An NDM survey is a geodetic measurement: we record to the millimeter at which elevation a building stands relative to NAP, so that later settlement can be established. Clients often commission both: the condition survey for the damage record, the NDM survey for the elevation.

When Dutch municipalities require an NDM survey

NDM surveys are mandatory in many Dutch municipalities for high-risk projects. We perform the measurements in line with applicable guidelines and deliver reports that meet the requirements of clients and authorities.

Our approach

How a settlement monitoring survey runs

From intake to delivery. Every step aligned with your schedule.

1

Installing measurement points

Measurement bolts are installed on the buildings to be monitored. Locations are determined in consultation with the client or structural engineer.

2

Baseline measurement

We record the elevation of all relevant buildings and structures within the area of influence. This is the reference for the entire project.

3

Periodic measurements

At agreed moments (before, during and after the work) we repeat the measurements and compare the results with the baseline.

4

Final report

After the work is completed you receive a final report with all measurement results, comparisons and conclusions about the impact on the surroundings.

What we deliver

What you receive after the baseline and final survey

Baseline measurement of all objects in the project area

Periodic elevation measurements in line with guidelines

Alerts when threshold values are exceeded

Final report comparing baseline and final measurement

SectorsProjects with preloadingSheet pile workDewatering operationsConstruction projects near existing buildings

A quote for NDM Surveys on your project. Three short questions, usually a response within 24 hours.

Go to the form
Frequently asked questions

Frequently asked questions about NDM surveys

The most asked questions about NDM Surveys. Question not listed? Feel free to get in touch.

Many municipalities require NDM for projects involving preloading, sheet pile work, dewatering or heavy earthworks near existing buildings. The exact requirement varies per municipality and project.

NDM focuses specifically on elevation differences for buildings within a project area, often as a condition of a building permit. Deformation monitoring is broader and also measures horizontal displacements of structures, dikes and other objects.

Preloading (raising terrain), installing sheet piles, dewatering (lowering groundwater) and heavy earthworks. These activities can cause surrounding buildings to shift in elevation.

The field survey is processed the same day. When threshold values are exceeded we contact you immediately. The formal report follows within a few working days.

“We are very satisfied with the dimensional control service across various projects. From the very first contact, communication has run smoothly.”

Pelle van Oost, WeComplete

“Michael had everything worked out the day before and was able to come the very next day. Delivers good work and is professional. We are very satisfied.”

Marian Kwakernaak, Particulier

“The dimensional control service was excellent. The team delivered accurate and timely results, which kept the project running smoothly.”

Melvin van Drie, Opdrachtgever
Request directly

Request a quote for NDM Surveys

Answer three short questions and leave your details. You usually get a response within 24 hours, on business days.

Step 2 of 3

Step 2 of 3: About your project

Request for:NDM Surveys

About your project

A town or city is enough.

Do you have a drawing or 3D model of the situation? *
When does the survey need to take place? *
MvD
Michael van Drie
Owner Dutch Survey BV

No-obligation advice on the approach for your project. Usually a response within 24 hours.