
The project
APM Terminals Maasvlakte II is being expanded by 51 hectares of container terminal. The CareGo consortium (ABB, Dura Vermeer and GMB) is delivering the civil works and electrification. Dutch Survey BV provided the survey work for Dura Vermeer on this project.
The expansion includes paving, concrete foundations, crane rails and the extension of the rail terminal. Once completed, the terminal capacity will double.
Our approach
- 1
Dimensional control and GPS measurements for paving, foundations and crane rails
- 2
Levelling and verification measurements during execution
- 3
Coordination with multiple parties within the CareGo consortium
Project info
- Client
- Dura Vermeer / CareGo
- Location
- Maasvlakte II, Rotterdam
- Year
- 2024
- Category
- Civil Surveying
Services used
dimensional controlgps surveyingprecision levelingas built verification
Comparable project?
We are happy to think along about the right surveying solution for your situation.
Get in touch

