
The project
A new T-junction has been built on the Maasvlakte beneath the Antarcticaweg, with large 3x2 metre concrete utility ducts. These ducts form a safe passage for pipelines between the existing Neste plant and the one under construction. In addition, a new side road has been built as an emergency entrance and exit.
Dutch Survey BV provided the survey work for Dura Vermeer. The project was carried out with partial weekend closures of the Antarcticaweg.
Our approach
- 1
Setting out and dimensional control for the T-junction and utility duct positions
- 2
Levelling for drainage and connection to the existing road profile
- 3
Survey work during partial weekend closures of the Antarcticaweg
Project info
- Client
- Dura Vermeer / Port of Rotterdam
- Location
- Maasvlakte, Rotterdam
- Year
- 2025
- Category
- Civil Surveying
Services used
land surveyingdimensional controlprecision levelinggps surveying
Comparable project?
We are happy to think along about the right surveying solution for your situation.
Get in touch

